изображение изображение изображение изображение изображение

Design of an ethane recovery and low-temperature condensation unit for the Otradnensky gas processing plant as approved by the State Expertise Board

18.11.2014

Premium Engineering is participating in the upgrade of the Otradnensky gas processing plant (GPP). Our design department has completed the construction documentation for a new ethane recovery and low-temperature condensation unit. The project was approved by the State Expertise Board and on 11th of November 2014 the Russian Federation State Expertise Evaluation Department (Glavgosekspertiza) gave its official approval for the project.


The modernization of ethane recovery and low-temperature condensation units will boost the recovery of C3+B fractions up to 95%. The production capacity in terms of fresh feed (dry gas) will be 300 mln m3/year. The plant will produce dry stripped gas, grade B ethane fraction, as well as natural gas liquids.


This is our third ethane recovery and LTC project (which includes basic and detailed engineering) approved by the State Expertise Board in 2014. The design institute of Premium Engineering adheres to the highest engineering standards in natural gas processing at the well head as well as in the deep treatment of gas. Premium Engineering has been active in upgrading many of Russia's oldest gas processing plants (GPP): the Minnibaevsky GPP, Neftegorsky GPP, and the Otradnensky GPP.


Back to the list